Back to the 2009 bathroom remodel (wow, two years ago already). As I covered in my previous posts, my husband remodeled our upstairs guest bathroom back in 2009. We were able to save quite a bit of money in labor and use high-end products that we are still really happy with.
Today: The Vanity
Once the floor was installed it was time for the vanity. We picked out a dark wood vanity, the wood color matched a swirl in the granite for the floor. Because the space for the vanity was a bit larger than the vanity itself, we also purchased an extra piece of matching trim board, to bridge the small gap that was going to be left. That allowed us toget a vanity off the shelf rather than custom which saved quite a bit of money.
When visiting someone's home that winter, we saw a great idea. They had installed tube lighting under their vanity that can be used as a night light. We copied the idea for our bathroom, and wired the lighting on its own light switch.
Next it was time for the countertop. My husband had heard about a place that sold granite remnants left from larger kitchen and bathroom jobs. We headed over to their office with one of our floor tiles. Luck would have it that they had a piece of matching granite that would work! We also had back and sidespashes and a threshold for the floor cut from the same piece. They came to measure our space, we told them what kind of sink we wanted and what facuet we were installing, and they cut the granite to our specifications. Awesome!
The faucet was from Home Depot. We picked one that would go with our modern vibe. We also ended up buying coordinating drawer pulls because the ones that came with the vanity didn't fit our style.
Things were really taking shape, next it was time for the biggest project- tiling the tub surround!
Thrifty: 1. practicing or showing thrift; economical; provident 2. thriving; flourishing; prospering. Thrifty implies industry and clever management of one's money or resources, usually so as to result in some savings.
Showing posts with label bathroom remodel. Show all posts
Showing posts with label bathroom remodel. Show all posts
Friday, January 7, 2011
Tuesday, October 19, 2010
DIY Project- Bathroom Remodel Part 3
As I mentioned here, here and here, in 2009 we (well mostly my husband) remodeled our guest bathroom. We were able to use high-end products and keep the project thrifty by doing the work ourselves.
After the heated floor coils were put in, it was time to lay the floor tile. We picked out granite tiles at Home Depot, the color was called Golden River.
This was the third home improvement project my husband had tackled that required a tile saw. In the past we had rented by the day, but this time took the plunge and bought one. Since he had to use it for the floor tiles as well as the upcoming wall tiles, it made sense. He was also tired of feeling rushed, like he had to get everything done in one day so he could return the saw. We can also use it on future projects. It was $50 per day to rent a saw and $140 to buy one. So thrifty tip: If you keep renting a tool, it might make sense to buy one instead.
Next Up: The vanity and sink!
After the heated floor coils were put in, it was time to lay the floor tile. We picked out granite tiles at Home Depot, the color was called Golden River.
| Tiles all laid out |
| Had to cut a hole in one of the tiles for a toilet pipe |
| Mixing the mortar |
This was the third home improvement project my husband had tackled that required a tile saw. In the past we had rented by the day, but this time took the plunge and bought one. Since he had to use it for the floor tiles as well as the upcoming wall tiles, it made sense. He was also tired of feeling rushed, like he had to get everything done in one day so he could return the saw. We can also use it on future projects. It was $50 per day to rent a saw and $140 to buy one. So thrifty tip: If you keep renting a tool, it might make sense to buy one instead.
Next Up: The vanity and sink!
Labels:
bathroom remodel,
DIY,
home improvement
Sunday, October 3, 2010
DIY Project- Bathroom Remodel Part 3
The Heated Floor
One of the features we really wanted in our new bathroom was heated floors. How nice would it be to walk on nice, warm, floors on a cold morning! The heating wires had to be installed on the subfloor and then covered with layers of floor leveler (a liquid that you pour on that dries smooth and flat) before the tiles were laid. My husband used a kit that included the long piece of wire and metal tracks that attached to the floor which the wire was hooked to. There are also kits with pre-made mats but this was the better choice for us. We also had to wire in a programmable thermostat which is on the wall so the floor warms up at the right time each day.
Once the wires were installed and the floor was level it was time to put in the granite tile floor.... stay tuned!
One of the features we really wanted in our new bathroom was heated floors. How nice would it be to walk on nice, warm, floors on a cold morning! The heating wires had to be installed on the subfloor and then covered with layers of floor leveler (a liquid that you pour on that dries smooth and flat) before the tiles were laid. My husband used a kit that included the long piece of wire and metal tracks that attached to the floor which the wire was hooked to. There are also kits with pre-made mats but this was the better choice for us. We also had to wire in a programmable thermostat which is on the wall so the floor warms up at the right time each day.
| View of metal tracks and wires from the doorway |
| You can see the metal tracks and copper wire in toilet area (got to have warm feet while you're using it!) |
| Toilet area after one layer of floor leveler- you can still see the wires so another layer was needed |
Once the wires were installed and the floor was level it was time to put in the granite tile floor.... stay tuned!
Labels:
bathroom remodel,
DIY,
home improvement
Saturday, September 25, 2010
DIY Project- Bathroom Remodel Part 2
The first step was demolition. We removed the toilet and stored it in our guest room throughout the project as we were planning to keep it. Everything else but the bathtub had to go. And yes, we did have guests during that time who got to sleep in the same room as a random toilet, I covered it with a beach towel to make it "blend in!" Too bad I didn't get a picture of that.
| While demolishing the floor |
| Floor and vanity are gone! |
| Hole where toilet used to be |
| Tub surround is gone. Safety first! Note the red ear protection muffs ready for any loud noises. |
Labels:
bathroom remodel,
DIY,
home improvement
Wednesday, September 22, 2010
DIY Project- Bathroom Remodel
Back in December 2008, we (well mostly my husband) started our biggest do-it-yourself project to date: remodeling our upstairs guest bathroom. Here are some "before" shots. Over the next few weeks I plan to run a series of posts about the project, which was finished in April of 2009. It turned out to be a pretty thrifty project. My husband kept track of all of the money spent, and we ended up finding some good ways to save money while getting the new, stylish bathroom we wanted.
Right before demolition began- boring bathroom!
Before- Tub surround
Labels:
bathroom remodel,
DIY,
home improvement
Subscribe to:
Posts (Atom)